The Complete Ireland Guide · Updated September 2026
Everything you need to know about modular homes, sustainable garden pods, garden rooms, and affordable housing in Ireland — costs, planning permission, finance, build timelines, sustainability, and how modular compares to traditional construction. Authoritative, up-to-date, and written by New Chapter Homes — Ireland's luxury modular home builder.
Ready to explore specific homes? See our modular homes in Ireland for models, turnkey pricing and delivery, or browse our prices guide for indicative costs by size and specification.
| Model | Net price | VAT @ 23% | Price incl. VAT |
|---|---|---|---|
| Chapter One | €72,000 | €16,560 | €88,560 |
| Chapter Two | €60,000 | €13,800 | €73,800 |
| Chapter Three | €53,000 | €12,190 | €65,190 |
The advertised price is the price incl. VAT (23%). VAT is already included and must not be added again.
Advertised Chapter One, Chapter Two, Chapter Three, Garden Room and Bespoke modular home prices are the total price including VAT at 23% (the net price and VAT element are shown alongside each price). Prices exclude groundworks and foundations, site service connections and crane hire. Standard delivery and installation are included. Final pricing is subject to a site survey and a written quotation.
Jump to a section
Modular homes are high-quality, fully-fitted houses built in a controlled factory environment in sections called "modules". Each module is constructed to the same building codes and standards as a traditional home, then transported to your site, crane-lifted onto a permanent foundation, and connected to utilities.
Unlike mobile homes or caravans, modular homes are permanent, structural dwellings. In Ireland, they are classified as permanent buildings and may qualify for mortgages subject to individual lender criteria. New Chapter Homes' modular builds are designed to achieve an A2 BER standard, with the final rating dependent on the completed design, specification and certified assessment.
New Chapter Homes offers six distinct service lines:
• Chapter One — A two-bedroom modular home designed for comfortable living (from €88,560 incl. VAT) • Chapter Two — A studio modular capsule pod (from €73,800 incl. VAT) • Chapter Three — Designed for compact living (from €65,190 incl. VAT) • Coffee Bar Pod — A commercial-grade pod for cafés and retail • Garden Room — A luxury garden office, studio, or guest room (from €43,050 incl. VAT) • Site Accommodation — Fold-up worker housing for construction sites
Each build is designed for high energy performance, fully fitted, and typically installed in weeks rather than months (subject to site and planning).
All prices include VAT at 23%.
Modular homes can be a cost-effective alternative to traditional builds in Ireland. Here's a guide to our indicative pricing:
• Chapter One (two-bedroom home): from €88,560 incl. VAT • Chapter Two (studio capsule pod): from €73,800 incl. VAT • Chapter Three (compact living): from €65,190 incl. VAT • Bespoke family homes: from €98,400 incl. VAT • Garden Rooms (separate product): from €43,050 incl. VAT • Garden Pods (Chapter Three): from €65,190 incl. VAT
Indicative prices cover the specified modular building, delivery and installation. Foundations, groundworks, service connections, crane access requirements and other site-specific works are assessed following the site survey and identified separately in the written quotation.
All prices above include VAT at 23%.
Planning permission for modular homes in Ireland depends on the type, size, location and intended use of the build:
• Primary residences: A permanent independent dwelling normally requires planning permission. • Garden rooms under 30 sq metres: May qualify for exempted development as an ancillary garden structure, subject to all applicable conditions. • Class 3A exemption (from 27 July 2026): Permanent detached modular homes (32–45 sq m) in the rear garden of your principal residence may qualify for an exemption, subject to all applicable conditions on height, boundary setbacks, occupancy, and utility connections. Not all projects will qualify. • Commercial pods: May require commercial planning permission.
Exemptions apply only where every legal condition is satisfied. Customers must confirm their position with the relevant local authority or a qualified planning professional before proceeding. Use our free Planning Guide for general guidance.
One of the potential advantages of modular construction is speed:
• Factory build: typically 6–8 weeks • Site preparation (foundation, services): 2–4 weeks (can overlap with factory build) • On-site installation (crane, assembly, connection): 1–2 weeks • Total turnaround: typically 6–10 weeks from order to handover (indicative, subject to site and planning)
Compare this to a traditional build which can take 9–18 months. The factory-controlled environment reduces exposure to weather during manufacture, though site works remain weather-dependent. Actual timelines depend on site conditions, planning, and specification.
New Chapter Homes builds are designed with sustainability in mind:
• Designed to achieve an A2 BER standard • Factory construction can reduce construction waste compared to traditional builds • High-performance insulation and air-tight construction • Triple-glazed windows as standard • Solar-ready designs • Lower carbon emissions over the home's lifetime (dependent on specification)
Modular construction can also reduce site disruption, transport emissions, and noise pollution in your community.
New Chapter Homes does not lend money directly. We can discuss stage payment arrangements and point you toward independent finance advisors who may be able to help. We do not guarantee that any third-party finance will be available. Here's what to know:
• New Chapter Homes builds are designed to meet Irish building regulations and are designed to achieve an A2 BER standard • Written quotations identify any site-specific works separately
Contact us to discuss payment options for your project.
Why consider modular over traditional construction?
• Cost: Potentially cost-effective, with indicative pricing provided up front • Speed: Typically 6–10 weeks vs 9–18 months for traditional (indicative, subject to site and planning) • Quality: Factory-controlled, consistent standards • Energy: Designed to achieve an A2 BER standard (traditional builds often achieve B or C) • Waste: Factory construction can reduce construction waste • Weather: Manufacture is indoors, reducing weather exposure during the build phase • Disruption: Minimal on-site work and noise compared to traditional builds • Predictability: Written quotation with site-specific works identified separately
Garden rooms and pods are versatile, luxury additions to your property:
• Uses: Home office, art studio, gym, guest room, teen den, or ancillary garden living • Sizes: Typically 12–45 sq metres • Planning: Under 30 sq m, may qualify for exempted development as an ancillary garden structure (subject to all applicable conditions). A detached auxiliary dwelling of 32–45 sq m may qualify for the Class 3A exemption, subject to all applicable conditions. Larger units may require planning permission. An ancillary garden building must not automatically be described as a separate dwelling or rental property. • Cost: From €43,050 incl. VAT • Build time: Typically 4–6 weeks (indicative) • Designed to achieve an A2 BER standard • Fully wired, plumbed, and fitted
Sustainable pods use eco-friendly materials, are solar-ready, and designed for minimal environmental impact. Confirm planning status with your local authority or a qualified planning professional before proceeding.
Frequently Asked Questions
A modular home is a prefabricated house built in factory sections, transported to your site, and assembled on a permanent foundation. New Chapter Homes' modular builds are designed to achieve an A2 BER standard, fully fitted, and typically installed in 6–10 weeks (subject to site and planning).
Indicative prices range from €65,190 incl. VAT (Chapter Three) to €88,560 incl. VAT (Chapter One), with bespoke family homes from €98,400 incl. VAT. Garden rooms start from €43,050 incl. VAT and garden pods from €65,190 incl. VAT. Indicative prices cover the modular building, delivery and installation; site-specific works are assessed after the site survey and identified separately in the written quotation. All prices include VAT at 23%.
A permanent independent dwelling normally requires planning permission. Garden rooms under 30 sq m may qualify for exempted development as an ancillary garden structure, subject to all applicable conditions. From 27 July 2026, the Class 3A exemption may allow a detached auxiliary dwelling (32–45 sq m) in rear gardens without full planning permission, subject to all applicable conditions. Not all projects will qualify — confirm with your local authority or a qualified planning professional.
Modular homes can be a cost-effective alternative to traditional builds. They're also typically faster (6–10 weeks vs 9–18 months, subject to site and planning) and designed to achieve an A2 BER standard. Indicative pricing is provided up front, with site-specific works identified separately in the written quotation.
Typically 6–10 weeks from order to handover (indicative, subject to site and planning). Factory build takes approximately 6–8 weeks, on-site installation 1–2 weeks. Actual timelines depend on site conditions, planning, and specification.
New Chapter Homes does not lend money directly. We can discuss stage payment arrangements and point you toward independent finance advisors. We do not guarantee that any third-party finance will be available. Contact us to discuss payment options for your project.
A standalone, prefabricated structure for your garden — used as an office, studio, gym, or guest room. Under 30 sq m, they may qualify for exempted development as an ancillary garden structure, subject to all applicable conditions. A detached auxiliary dwelling of 32–45 sq m may qualify for the Class 3A exemption, subject to all applicable conditions. Garden rooms start from €43,050 incl. VAT, garden pods from €65,190 incl. VAT (residential modular homes start from €65,190 — Chapter Three).
Factory construction can reduce construction waste, and homes are designed to achieve an A2 BER standard with high-performance insulation, meaning lower energy bills and carbon emissions (dependent on specification and usage).
All 26 counties of Ireland, from our base in Naas, Co. Kildare. Key areas: Kildare, Dublin, Meath, Wicklow, Laois, Offaly, Kilkenny, Carlow, Wexford. Display village in Johnstown, Co. Kildare.
From 27 July 2026, the Class 3A exemption may allow a permanent detached auxiliary dwelling (32–45 sq m) in the rear garden of a principal residence without full planning permission, subject to all applicable conditions. Not all projects will qualify. An ancillary garden building must not automatically be described as a separate dwelling or rental property. Confirm with your local authority or a qualified planning professional.
A modular home is a full dwelling (kitchen, bathroom, living space) designed as a residence. A garden room is a smaller auxiliary structure (usually under 30 sq m) for additional space like an office or studio. An ancillary garden building must not automatically be described as a separate dwelling or rental property.
Get a free, no-obligation quote for your modular home, garden room, or sustainable pod today. Based in Naas, Co. Kildare — serving all of Ireland.
Explore More
Your Privacy & Cookie Consent
In accordance with the EU General Data Protection Regulation (GDPR) and the ePrivacy Directive, we use cookies and similar technologies to enhance your browsing experience, analyse site traffic, and personalise content. By clicking Accept All, you consent to our use of cookies. You may Decline to only allow strictly necessary cookies. For full details, see our Privacy Policy and Cookie Policy.