Choosing a Builder
Every modular home builder in Ireland can look similar in a brochure. The differences that matter - how the home is built, what documentation is supplied, what the quoted price includes and what support is available after handover - become clearer when you know what to ask. This guide explains how to compare builders using evidence rather than marketing claims.
When you are ready to compare models, layouts, prices and specifications, visit our Modular Homes Ireland page for the commercial range and buying process.
The phrase covers three different businesses, and the difference decides who is accountable when something goes wrong.
Builds the modules in a factory it owns or controls.
Takes responsibility for the whole build and may buy the modules from someone else.
Sells on behalf of a manufacturer and may have no role after handover.
None of these is automatically the right choice. A company that buys modules from a manufacturer can still run a well-managed project; what changes is where responsibility sits. Ask which of the three you are dealing with, and whose name is on the contract.
Most of the practical difference between builders comes down to five things:
The rest of this guide takes each one in turn.
Put these questions in writing and keep the reply:
The answers tell you who controls quality, who is standing on your site, and who you speak to when a decision has to be made. A company that subcontracts is not disqualified by that fact - but you should know it before you sign, not after.
No single document proves a build will go well, but together they show how a builder works.
| Document | What it demonstrates |
|---|---|
| Structural design certificate | The structure has been designed and checked for your specification |
| Assigned certifier and BCAR records, where a commencement notice applies | The statutory compliance route for the works |
| CE marking and Declaration of Performance | The products supplied meet their declared standards |
| Part L and BER assessment | How the design is expected to perform |
| Public liability, employer's liability and contract works insurance | Who carries risk during the build |
| Tax clearance and relevant registration | Normal for a contracted builder |
| Written specification and drawings | The thing you are actually buying |
| Warranty terms written into the contract | Who is liable, for what, and for how long |
Not every project needs every document, and a sensible builder will say which apply to yours and why. What matters is whether the answer is specific. Ask for the list in writing; a general assurance is not the same as a document. More on how these fit together on our building regulations compliance page, and the full build specification on our specification page.
A design target describes what a specification is expected to reach. A BER certificate describes what a specific completed dwelling actually achieved. They are not interchangeable, and the gap between them is where most confusion sits.
If a builder uses a rating word, ask two questions: which dwelling was that certificate issued for, and what specification was it achieved with - fabric, heating, ventilation and airtightness. Then ask whether a certificate for a completed home of the same specification can be supplied on request.
Running costs are a separate question again. They depend on occupancy, heating habits and tariffs, so they are worth discussing after the certificate, not instead of it.
“Turnkey” has no fixed meaning between companies. Two quotes for a comparable home can differ mainly in what was never mentioned. Go through this list item by item and get the answer in writing:
Ask for an exclusions list, not just an inclusions list. A short, specific exclusion list is more useful than a long inclusions list, because it is the exclusions that move the final figure.
Ask what is covered, for how long, who provides it - the builder or an insurer - and what is excluded. Then ask how a claim is made and who answers.
A warranty described only in conversation is not a warranty. The version that matters is the one written into the contract before you pay a deposit, along with a snagging process: how defects are listed, who resolves them, and when the snagging period ends.
Every modular project runs through the same sequence: planning requirements, site preparation and foundations, manufacture, delivery, installation, service connections, commissioning and handover. The dependencies between those stages are where programmes move.
Ask for the factory period and the site period separately, and ask what each assumes. A single figure hides the dependency - if groundworks run late, the factory slot moves with them. The useful answer names the assumptions, not just the duration.
Ask for two or three recent clients, ideally with a site similar to yours. Ask them about communication during the build, how snags were handled, and what happened after handover. Those three answers are difficult to prepare for and easy to give honestly.
Visit a completed home if you can, and the factory if it is offered. Photographs show finish. A visit shows how the home was assembled, how the junctions are finished, and who was on site doing the work. Our display village page (coming soon) and completed projects are a starting point for that visit.
| Question | What a clear answer tells you |
|---|---|
| Who owns the factory that builds the modules? | Who controls quality |
| Who employs the installation crew? | Who is working on your site |
| Which documents will be supplied before I sign? | The compliance route for your project |
| Which dwelling was your BER certificate issued for? | Whether the energy claim is evidenced |
| What exactly is excluded from this price? | The real scope |
| Is VAT included? | A like-for-like comparison |
| What happens if groundworks run late? | How programme risk is handled |
| What is excluded from the warranty? | What you actually hold |
| Who do I contact after handover, and how? | The aftercare route |
| Can I speak to two recent clients? | Track record you can check |
| Can I visit a completed home or the factory? | What you are buying |
| What is the snagging process, and when does it end? | How handover is managed |
The most useful way to use this guide is to put the questions to us directly. Discuss your project with us or request the brochure, and we will answer the same list in writing.
Your Privacy & Cookie Consent
In accordance with the EU General Data Protection Regulation (GDPR) and the ePrivacy Directive, we use cookies and similar technologies to enhance your browsing experience, analyse site traffic, and personalise content. By clicking Accept All, you consent to our use of cookies. You may Decline to only allow strictly necessary cookies. For full details, see our Privacy Policy and Cookie Policy.